OBJECTIVE:

To verify that the machine at the Manufacturer’s site is ready as per the Design Qualifications and in line with all the Technical Specifications laid down in the User Requirement Specification.

SCOPE:

The scope of this document is limited to the Factory Acceptance Test of Induction Sealing machine with 5 feet conveyor belt.

RESPONSIBILITIES:

Manufacturer

  • The manufacturer is responsible for the preparation of the FAT protocol, unless and until it is specified by the Customer for its indigenous protocol.
  • The manufacturer shall assist the customer in performing the Factory Acceptance Test at the manufacturer’s factory, until and unless it is specified by the customer to conduct the PROXY-FAT.

Customer

  • The Customer shall conduct the Factory Acceptance Test at the manufacturer’s factory.
  • In case the customer wants the manufacturer to conduct the PROXY-FAT, a written communication, as an ANNEXURE, shall be attached along with this protocol
  • Execution team for the FAT conducting consist of__________
  • FAT BY THE CUSTOMER
  • PROXY-FAT BY THE MANUFACTURER

VERIFICATION OF TECHNICAL SPECIFICATION:

Sr. NoParameterSpecifications
1.CONVEYOR MOTORMAKE : BONFIGLIOLI

0.25HP/0.18KW/1.01A/230V/1360RPM/3PHASE

SRNO.202180473348

2.CONVEYOR GEARBOXMAKE : BONFIGLIOLI

MODEL : VF44 F120 P63 B5B3

SRNO.210000103293030023

RATIO : 20:01

3.INDUCTION DEVICEMAKE : ELECTRONICS DEVICES

MODEL : SIGMA 2 NEO

SRNO. S2NP142/21-22

4.HEIGHT INDICATORMAKE : RAJDEEP AUTOMATION
5.MAIN SWITCHMAKE : SCHNEIDER
6.MACHINE DIMENSION1800mm L x 800mm W x 1700mm H

VERIFICATION OF MATERIAL OF CONSTRUCTION:

ComponentMOC
External claddingSS 304
 4 feet Conveyor BeltDalrin
Bottle GuideAcrylic
4 feet  Conveyor Driving Chain WheelNylon
Machine Frame StructureSS 304

VERIFICATION OF INSTRUMENT:

Sr. No.ComponentSpecification
1.      PotentiometerMake:  POT KNOB

VERIFICATION OF OPERATION:

Sr. No.Method of SimulationFunction
1.Main Power ON/OFF switchTo supply power to the unit with Green indication ‘ON’
2.PotentiometerFor the speed variation

VERIFICATION OF INTERLOCKS (IF ANY):

Sr. No.Interlock FeatureMethod of testingAcceptance Criteria

N.A.

MACHINE TRIAL SHEET:

RUN TEST

Sr. No.Check PointsObservation
1.           Machine trail in empty run 
2.           Abnormal Sound 

SUGGESTIONS / MODIFICATIONS:

COMMENTS FROM THE CUSTOMER /MANUFACTURER’S ACCEPTANCE

FAT CLOSE OUT:

  • The Factory Acceptance Test for Turn Table stands completed.
  • All the parameters have been checked and found in line with the requirement
  • The machine is cleared, by the undersigned authority.

Alvina

Alvina is the Author and founder of Guidelinepharma, she is a pharmaceutical professional having more than 20 years of rich experience in pharmaceutical field. During her career, she works in the quality assurance department with multinational companies i.e Zydus Cadila Ltd, Unichem Laboratories Ltd, Indoco remedies Ltd, Panacea Biotec Ltd, and Nectar life Science Ltd. During his experience, she faces many regulatorily audits i.e. USFDA, MHRA, ANVISA, MCC, TGA, EU –GMP, WHO –Geneva, ISO 9001-2008 and many ROW Regularities Audit i.e.Uganda, Kenya, Tanzania, Zimbabwe. She is currently leading a regulatory pharmaceutical company as a Head Quality. You can join him by Email, Facebook, Google+, Twitter, and YouTube